docs: update gantt docs
Added descriptions of title and section statements and how to style todayMarker.
This commit is contained in:
parent
8492503d4f
commit
09f10d2d7e
@ -3,15 +3,15 @@
|
||||
> A Gantt chart is a type of bar chart, first developed by Karol Adamiecki in 1896, and independently by Henry Gantt in the 1910s, that illustrates a project schedule and the amount of time it would take for any one project to finish. Gantt charts illustrate number of days between the start and finish dates of the terminal elements and summary elements of a project.
|
||||
|
||||
## A note to users
|
||||
Gannt Charts will record each scheduled task as one continuous bar that extends from the left to the right. The x axis represents time and the y records the different tasks and the order in which they are to be completed.
|
||||
Gantt Charts will record each scheduled task as one continuous bar that extends from the left to the right. The x axis represents time and the y records the different tasks and the order in which they are to be completed.
|
||||
|
||||
It is important to remember that when a date, day or collection of dates specific to a task are "excluded", the Gannt Chart will accomodate those changes by extending an equal number of day, towards the right, not by creating a gap inside the task.
|
||||
As shown here ![](https://github.com/NeilCuzon/mermaid/blob/develop/docs/img/Gantt-excluded-days-within.png)
|
||||
It is important to remember that when a date, day, or collection of dates specific to a task are "excluded", the Gantt Chart will accomodate those changes by extending an equal number of day, towards the right, not by creating a gap inside the task.
|
||||
As shown here ![](https://raw.githubusercontent.com/NeilCuzon/mermaid/develop/docs/img/Gantt-excluded-days-within.png)
|
||||
|
||||
However, if the excluded date/s is between two tasks that are set to start consecutively, the excluded dates will be skipped graphically and left blank, and the following task will begin after the end of the excluded date/s.
|
||||
As shown here ![](https://github.com/NeilCuzon/mermaid/blob/develop/docs/img/Gantt-long-weekend-look.png)
|
||||
However, if the excluded dates are between two tasks that are set to start consecutively, the excluded dates will be skipped graphically and left blank, and the following task will begin after the end of the excluded dates.
|
||||
As shown here ![](https://raw.githubusercontent.com/NeilCuzon/mermaid/develop/docs/img/Gantt-long-weekend-look.png)
|
||||
|
||||
A Gantt chart is useful for tracking the amount of time it would take before a project is finished, but it can also be used to graphically represent "non-working days, with a few tweaks.
|
||||
A Gantt chart is useful for tracking the amount of time it would take before a project is finished, but it can also be used to graphically represent "non-working days", with a few tweaks.
|
||||
|
||||
Mermaid can render Gantt diagrams as SVG, PNG or a MarkDown link that can be pasted into docs.
|
||||
|
||||
@ -117,12 +117,14 @@ It is possible to set multiple depenendenies separated by space:
|
||||
|
||||
### Title
|
||||
|
||||
Tbd
|
||||
The `title` is an *optional* string to be displayed at the top of the Gantt chart to describe the chart as a whole.
|
||||
|
||||
|
||||
## Sections statements
|
||||
### Section statements
|
||||
|
||||
Tbd
|
||||
You can divide the chart into various sections, for example to separate different parts of a project like development and documentation.
|
||||
|
||||
To do so, start a line with the `section` keyword and give it a name. (Note that unlike with the [title for the entire chart](#title), this name is *required*.
|
||||
|
||||
|
||||
## Setting dates
|
||||
@ -293,6 +295,19 @@ noteText | Styles for the text on in the note boxes.
|
||||
}
|
||||
```
|
||||
|
||||
## Today marker
|
||||
|
||||
You can style or hide the marker for the current date. To style it, add a value for the `todayMarker` key.
|
||||
|
||||
```
|
||||
todayMarker stroke-width:5px,stroke:#0f0,opacity:0.5
|
||||
```
|
||||
|
||||
To hide the marker, set `todayMarker` to `off`.
|
||||
|
||||
```
|
||||
todayMarker off
|
||||
```
|
||||
|
||||