1. Added a Gantt diagram that demonstrates to users that hashtages and semicolons can be added to titles, sections, and task data. Changes to gantt.spec.js 1. Added unit tests to ensure that semicolons and hashtags didn't break the functionality of the gantt diagram when used in titles, sections or task data. Changes to /parser/gantt.spec.js 1. Added rendering tests to ensure that semicolons and hashtags in titles, sections, and task data didn't break the rendering of Gantt diagrams.
689 lines
19 KiB
JavaScript
689 lines
19 KiB
JavaScript
import { imgSnapshotTest, renderGraph } from '../../helpers/util.ts';
|
|
|
|
describe('Gantt diagram', () => {
|
|
beforeEach(() => {
|
|
cy.clock(new Date('1010-10-10').getTime());
|
|
});
|
|
it('should render a gantt chart', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d/%m
|
|
title Adding GANTT diagram to mermaid
|
|
excludes weekdays 2014-01-10
|
|
|
|
section A section
|
|
Completed task :done, des1, 2014-01-06,2014-01-08
|
|
Active task :active, des2, 2014-01-09, 3d
|
|
Future task : des3, after des2, 5d
|
|
Future task2 : des4, after des3, 5d
|
|
|
|
section Critical tasks
|
|
Completed task in the critical line :crit, done, 2014-01-06,24h
|
|
Implement parser and jison :crit, done, after des1, 2d
|
|
Create tests for parser :crit, active, 3d
|
|
Future task in critical line :crit, 5d
|
|
Create tests for renderer :2d
|
|
Add to mermaid :1d
|
|
|
|
section Documentation
|
|
Describe gantt syntax :active, a1, after des1, 3d
|
|
Add gantt diagram to demo page :after a1 , 20h
|
|
Add another diagram to demo page :doc1, after a1 , 48h
|
|
|
|
section Last section
|
|
Describe gantt syntax :after doc1, 3d
|
|
Add gantt diagram to demo page : 20h
|
|
Add another diagram to demo page : 48h
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
it('Handle multiline section titles with different line breaks', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d/%m
|
|
title GANTT diagram with multiline section titles
|
|
excludes weekdays 2014-01-10
|
|
|
|
section A section<br>multiline
|
|
Completed task : done, des1, 2014-01-06,2014-01-08
|
|
Active task : active, des2, 2014-01-09, 3d
|
|
Future task : des3, after des2, 5d
|
|
Future task2 : des4, after des3, 5d
|
|
|
|
section Critical tasks<br/>multiline
|
|
Completed task in the critical line : crit, done, 2014-01-06, 24h
|
|
Implement parser and jison : crit, done, after des1, 2d
|
|
Create tests for parser : crit, active, 3d
|
|
Future task in critical line : crit, 5d
|
|
Create tests for renderer : 2d
|
|
Add to mermaid : 1d
|
|
|
|
section Documentation<br />multiline
|
|
Describe gantt syntax : active, a1, after des1, 3d
|
|
Add gantt diagram to demo page : after a1, 20h
|
|
Add another diagram to demo page : doc1, after a1, 48h
|
|
|
|
section Last section<br />multiline
|
|
Describe gantt syntax : after doc1, 3d
|
|
Add gantt diagram to demo page : 20h
|
|
Add another diagram to demo page : 48h
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
it('Multiple dependencies syntax', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d/%m
|
|
title Adding GANTT diagram to mermaid
|
|
excludes weekdays 2014-01-10
|
|
|
|
apple :a, 2017-07-20, 1w
|
|
banana :crit, b, 2017-07-23, 1d
|
|
cherry :active, c, after b a, 1d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
it('should FAIL redering a gantt chart for issue #1060 with invalid date', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
excludes weekdays 2017-01-10
|
|
title Projects Timeline
|
|
|
|
section asdf
|
|
specs :done, :ps, 2019-05-10, 50d
|
|
Plasma :pc, 2019-06-20, 60d
|
|
Rollup :or, 2019-08-20, 50d
|
|
|
|
section CEL
|
|
|
|
plasma-chamber :done, :pc, 2019-05-20, 60d
|
|
Plasma Implementation (Rust) :por, 2019-06-20, 120d
|
|
Predicates (Atomic Swap) :pred, 2019-07-20, 60d
|
|
|
|
section DEX
|
|
|
|
History zkSNARK :hs, 2019-08-10, 40d
|
|
Exit :vs, after hs, 60d
|
|
PredicateSpec :ps, 2019-09-1, 20d
|
|
PlasmaIntegration :pi, after ps,40d
|
|
|
|
|
|
section Events
|
|
|
|
ETHBoston :done, :eb, 2019-09-08, 3d
|
|
DevCon :active, :dc, 2019-10-08, 3d
|
|
|
|
section Plasma Calls & updates
|
|
OVM :ovm, 2019-07-12, 120d
|
|
Plasma call 26 :pc26, 2019-08-21, 1d
|
|
Plasma call 27 :pc27, 2019-09-03, 1d
|
|
Plasma call 28 :pc28, 2019-09-17, 1d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should default to showing today marker', () => {
|
|
// This test only works if the environment thinks today is 1010-10-10
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title Show today marker (vertical line should be visible)
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d
|
|
%% Should default to being on
|
|
%% todayMarker on
|
|
section Section1
|
|
Yesterday: 1010-10-09, 1d
|
|
Today: 1010-10-10, 1d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should hide today marker', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title Hide today marker (vertical line should not be visible)
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d
|
|
todayMarker off
|
|
section Section1
|
|
Yesterday: 1010-10-09, 1d
|
|
Today: 1010-10-10, 1d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should style today marker', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title Style today marker (vertical line should be 5px wide and half-transparent blue)
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d
|
|
todayMarker stroke-width:5px,stroke:#00f,opacity:0.5
|
|
section Section1
|
|
Yesterday: 1010-10-09, 1d
|
|
Today: 1010-10-10, 1d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should handle milliseconds', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat x
|
|
axisFormat %L
|
|
section Section
|
|
A task :a1, 0, 30ms
|
|
Another task :after a1, 20ms
|
|
section Another
|
|
Another another task :b1, 20, 12ms
|
|
Another another another task :after b1, 0.024s
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram when useMaxWidth is true (default)', () => {
|
|
renderGraph(
|
|
`
|
|
gantt
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d/%m
|
|
title Adding GANTT diagram to mermaid
|
|
excludes weekdays 2014-01-10
|
|
|
|
section A section
|
|
Completed task :done, des1, 2014-01-06,2014-01-08
|
|
Active task :active, des2, 2014-01-09, 3d
|
|
Future task : des3, after des2, 5d
|
|
Future task2 : des4, after des3, 5d
|
|
|
|
section Critical tasks
|
|
Completed task in the critical line :crit, done, 2014-01-06,24h
|
|
Implement parser and jison :crit, done, after des1, 2d
|
|
Create tests for parser :crit, active, 3d
|
|
Future task in critical line :crit, 5d
|
|
Create tests for renderer :2d
|
|
Add to mermaid :1d
|
|
|
|
section Documentation
|
|
Describe gantt syntax :active, a1, after des1, 3d
|
|
Add gantt diagram to demo page :after a1 , 20h
|
|
Add another diagram to demo page :doc1, after a1 , 48h
|
|
|
|
section Last section
|
|
Describe gantt syntax :after doc1, 3d
|
|
Add gantt diagram to demo page : 20h
|
|
Add another diagram to demo page : 48h
|
|
`,
|
|
{ gantt: { useMaxWidth: true } }
|
|
);
|
|
cy.get('svg').should((svg) => {
|
|
expect(svg).to.have.attr('width', '100%');
|
|
// expect(svg).to.have.attr('height');
|
|
// use within because the absolute value can be slightly different depending on the environment ±5%
|
|
// const height = parseFloat(svg.attr('height'));
|
|
// expect(height).to.be.within(484 * 0.95, 484 * 1.05);
|
|
const style = svg.attr('style');
|
|
expect(style).to.match(/^max-width: [\d.]+px;$/);
|
|
const maxWidthValue = parseFloat(style.match(/[\d.]+/g).join(''));
|
|
expect(maxWidthValue).to.be.within(
|
|
Cypress.config().viewportWidth * 0.95,
|
|
Cypress.config().viewportWidth * 1.05
|
|
);
|
|
});
|
|
});
|
|
|
|
it('should render a gantt diagram when useMaxWidth is false', () => {
|
|
renderGraph(
|
|
`
|
|
gantt
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d/%m
|
|
title Adding GANTT diagram to mermaid
|
|
excludes weekdays 2014-01-10
|
|
|
|
section A section
|
|
Completed task :done, des1, 2014-01-06,2014-01-08
|
|
Active task :active, des2, 2014-01-09, 3d
|
|
Future task : des3, after des2, 5d
|
|
Future task2 : des4, after des3, 5d
|
|
|
|
section Critical tasks
|
|
Completed task in the critical line :crit, done, 2014-01-06,24h
|
|
Implement parser and jison :crit, done, after des1, 2d
|
|
Create tests for parser :crit, active, 3d
|
|
Future task in critical line :crit, 5d
|
|
Create tests for renderer :2d
|
|
Add to mermaid :1d
|
|
|
|
section Documentation
|
|
Describe gantt syntax :active, a1, after des1, 3d
|
|
Add gantt diagram to demo page :after a1 , 20h
|
|
Add another diagram to demo page :doc1, after a1 , 48h
|
|
|
|
section Last section
|
|
Describe gantt syntax :after doc1, 3d
|
|
Add gantt diagram to demo page : 20h
|
|
Add another diagram to demo page : 48h
|
|
`,
|
|
{ gantt: { useMaxWidth: false } }
|
|
);
|
|
cy.get('svg').should((svg) => {
|
|
const width = parseFloat(svg.attr('width'));
|
|
expect(width).to.be.within(
|
|
Cypress.config().viewportWidth * 0.95,
|
|
Cypress.config().viewportWidth * 1.05
|
|
);
|
|
expect(svg).to.not.have.attr('style');
|
|
});
|
|
});
|
|
it('should render a gantt diagram with data labels at the top when topAxis is true', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d/%m
|
|
title Adding GANTT diagram to mermaid
|
|
excludes weekdays 2014-01-10
|
|
|
|
section A section
|
|
Completed task :done, des1, 2014-01-06,2014-01-08
|
|
Active task :active, des2, 2014-01-09, 3d
|
|
Future task : des3, after des2, 5d
|
|
Future task2 : des4, after des3, 5d
|
|
|
|
section Critical tasks
|
|
Completed task in the critical line :crit, done, 2014-01-06,24h
|
|
Implement parser and jison :crit, done, after des1, 2d
|
|
Create tests for parser :crit, active, 3d
|
|
Future task in critical line :crit, 5d
|
|
Create tests for renderer :2d
|
|
Add to mermaid :1d
|
|
|
|
section Documentation
|
|
Describe gantt syntax :active, a1, after des1, 3d
|
|
Add gantt diagram to demo page :after a1 , 20h
|
|
Add another diagram to demo page :doc1, after a1 , 48h
|
|
|
|
section Last section
|
|
Describe gantt syntax :after doc1, 3d
|
|
Add gantt diagram to demo page : 20h
|
|
Add another diagram to demo page : 48h
|
|
`,
|
|
{ gantt: { topAxis: true } }
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 2 milliseconds', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat SSS
|
|
axisFormat %Lms
|
|
tickInterval 2millisecond
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 000, 6ms
|
|
Another task : after a1, 6ms
|
|
section Another
|
|
Task in sec : a2, 006, 3ms
|
|
another task : 3ms
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 2 seconds', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat ss
|
|
axisFormat %Ss
|
|
tickInterval 2second
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 00, 6s
|
|
Another task : after a1, 6s
|
|
section Another
|
|
Task in sec : 06, 3s
|
|
another task : 3s
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 15 minutes', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %H:%M
|
|
tickInterval 15minute
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 2022-10-03, 6h
|
|
Another task : after a1, 6h
|
|
section Another
|
|
Task in sec : 2022-10-03, 3h
|
|
another task : 3h
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 6 hours', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %d %H:%M
|
|
tickInterval 6hour
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 2022-10-03, 1d
|
|
Another task : after a1, 2d
|
|
section Another
|
|
Task in sec : 2022-10-04, 2d
|
|
another task : 2d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 1 day', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %m-%d
|
|
tickInterval 1day
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 2022-10-01, 30d
|
|
Another task : after a1, 20d
|
|
section Another
|
|
Task in sec : 2022-10-20, 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 1 week', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %m-%d
|
|
tickInterval 1week
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 2022-10-01, 30d
|
|
Another task : after a1, 20d
|
|
section Another
|
|
Task in sec : 2022-10-20, 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 1 week, with the day starting on monday', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %m-%d
|
|
tickInterval 1week
|
|
weekday monday
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 2022-10-01, 30d
|
|
Another task : after a1, 20d
|
|
section Another
|
|
Task in sec : 2022-10-20, 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 1 month', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %m-%d
|
|
tickInterval 1month
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 2022-10-01, 30d
|
|
Another task : after a1, 20d
|
|
section Another
|
|
Task in sec : 2022-10-20, 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it('should render a gantt diagram with tick is 1 day and topAxis is true', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title A Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %m-%d
|
|
tickInterval 1day
|
|
excludes weekends
|
|
|
|
section Section
|
|
A task : a1, 2022-10-01, 30d
|
|
Another task : after a1, 20d
|
|
section Another
|
|
Task in sec : 2022-10-20, 12d
|
|
another task : 24d
|
|
`,
|
|
{ gantt: { topAxis: true } }
|
|
);
|
|
});
|
|
|
|
// TODO: fix it
|
|
//
|
|
// This test is skipped deliberately
|
|
// because it fails and blocks our development pipeline
|
|
// It was added as an attempt to fix gantt performance issues
|
|
//
|
|
// https://github.com/mermaid-js/mermaid/issues/3274
|
|
//
|
|
it.skip('should render a gantt diagram with very large intervals, skipping excludes if interval > 5 years', () => {
|
|
imgSnapshotTest(
|
|
`gantt
|
|
title A long Gantt Diagram
|
|
dateFormat YYYY-MM-DD
|
|
axisFormat %m-%d
|
|
tickInterval 1day
|
|
excludes weekends
|
|
section Section
|
|
A task : a1, 9999-10-01, 30d
|
|
Another task : after a1, 20d
|
|
section Another
|
|
Task in sec : 2022-10-20, 12d
|
|
another task : 24d
|
|
`
|
|
);
|
|
});
|
|
|
|
it('should render when compact is true', () => {
|
|
imgSnapshotTest(
|
|
`
|
|
---
|
|
displayMode: compact
|
|
---
|
|
gantt
|
|
title GANTT compact
|
|
dateFormat HH:mm:ss
|
|
axisFormat %Hh%M
|
|
|
|
section DB Clean
|
|
Clean: 12:00:00, 10m
|
|
Clean: 12:30:00, 12m
|
|
Clean: 13:00:00, 8m
|
|
Clean: 13:30:00, 9m
|
|
Clean: 14:00:00, 13m
|
|
Clean: 14:30:00, 10m
|
|
Clean: 15:00:00, 11m
|
|
|
|
section Sessions
|
|
A: 12:00:00, 63m
|
|
B: 12:30:00, 12m
|
|
C: 13:05:00, 12m
|
|
D: 13:06:00, 33m
|
|
E: 13:15:00, 55m
|
|
F: 13:20:00, 12m
|
|
G: 13:32:00, 18m
|
|
H: 13:50:00, 20m
|
|
I: 14:10:00, 10m
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it("should render when there's a semicolon in the title", () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title ;Gantt With a Semicolon in the Title
|
|
dateFormat YYYY-MM-DD
|
|
section Section
|
|
A task :a1, 2014-01-01, 30d
|
|
Another task :after a1 , 20d
|
|
section Another
|
|
Task in sec :2014-01-12 , 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it("should render when there's a semicolon in a section is true", () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title Gantt Digram
|
|
dateFormat YYYY-MM-DD
|
|
section ;Section With a Semicolon
|
|
A task :a1, 2014-01-01, 30d
|
|
Another task :after a1 , 20d
|
|
section Another
|
|
Task in sec :2014-01-12 , 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it("should render when there's a semicolon in the task data", () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title Gantt Digram
|
|
dateFormat YYYY-MM-DD
|
|
section Section
|
|
;A task with a semiclon :a1, 2014-01-01, 30d
|
|
Another task :after a1 , 20d
|
|
section Another
|
|
Task in sec :2014-01-12 , 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it("should render when there's a hashtag in the title", () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title #Gantt With a Hashtag in the Title
|
|
dateFormat YYYY-MM-DD
|
|
section Section
|
|
A task :a1, 2014-01-01, 30d
|
|
Another task :after a1 , 20d
|
|
section Another
|
|
Task in sec :2014-01-12 , 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it("should render when there's a hashtag in a section is true", () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title Gantt Digram
|
|
dateFormat YYYY-MM-DD
|
|
section #Section With a Hashtag
|
|
A task :a1, 2014-01-01, 30d
|
|
Another task :after a1 , 20d
|
|
section Another
|
|
Task in sec :2014-01-12 , 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
|
|
it("should render when there's a hashtag in the task data", () => {
|
|
imgSnapshotTest(
|
|
`
|
|
gantt
|
|
title Gantt Digram
|
|
dateFormat YYYY-MM-DD
|
|
section Section
|
|
#A task with a hashtag :a1, 2014-01-01, 30d
|
|
Another task :after a1 , 20d
|
|
section Another
|
|
Task in sec :2014-01-12 , 12d
|
|
another task : 24d
|
|
`,
|
|
{}
|
|
);
|
|
});
|
|
});
|